Provide the operating pattern
Record forklift traffic, vehicle approaches and pedestrian routes for each opening. Identify façade exposure and physical closure requirements when considering an exterior opening.
Check movement and service space
Show headroom, supports, service access and power position. Describe the required view through the curtain and activation method.
Compare a like-for-like scope
Review curtain material, vision sections, controls, installation and commissioning against the same application brief. Obtain written confirmation for the proposed arrangement.