Classify each opening
Goods intake, inter-bay forklift movement and dispatch openings may have different duty cycles. Record the vehicle route, personnel movement and shift pattern.
Coordinate the structure
Show crane rails, ducts, lighting and other overhead services relative to tracks or fabric head assemblies. Provide details for existing and new fixing surfaces.
Plan downtime
Agree removal and installation windows with production and dispatch teams early in the renovation programme.
Openings that fit production
Assign a role to each opening in goods receipt, production and dispatch. External closure, frequent internal cycling, vehicle access and pedestrian traffic shape different project briefs. Coordinate refurbishment with shift patterns and alternate routes.