Procurement package
Send the country and city, opening schedule, dimensioned drawings, operating conditions and target delivery programme. Reference each product to the relevant opening.
Supply and service boundaries
Specify document language, packaging, delivery point, freight and unloading responsibilities. Review local installation and commissioning independently from supply.
Drawings and interfaces
Keep supplier and local contractor drawings aligned to site-approved dimensions and civil, electrical and control interfaces. Track the revision used for product approval.
Documentation at delivery
Coordinate packing labels, opening references and site receiving checks. Confirm the scope, destination conditions and available documentation for the proposed model.