Coordinate site readiness, installed interfaces, commissioning and handover before setting the working programme.

Installation and commissioning checks on a sectional door

Before works

Check the opening, fixing surfaces, access, unloading position, working area and supply. In a live facility, agree closure windows and temporary routes with the site team.

Building and controls interfaces

Identify who is responsible for electrical, civil and control works. Where building management or alarm interfaces are specified, agree the functions and commissioning responsibilities.

Commissioning scope

Relate checks, operating sequences and acceptance records to the proposed model and project requirements. Coordinate the parties that must be present.

Handover records

Match installed products to opening references. Assemble operating and maintenance documents, contact details and any remaining items in the handover record.

Prepare for the first discussion

  • Prepared fixings and work programme
  • Electrical and access responsibilities
  • Unloading and temporary storage arrangements
  • Agreed commissioning and handover records

Project stages

  1. Prepare the site

    Confirm dimensions, access, supports and supply.

  2. Coordinate the work

    Match installation and commissioning to the facility programme.

  3. Record handover

    Link the installed system, documents and accepted functions.