Define the opening, vehicle and pedestrian traffic, site constraints and building interfaces before specifying equipment.

Sectional doors with vision sections inside a factory

Opening schedule

Give every opening a reference, use and drawing number. Show clear passage, structural opening, headroom, side clearances, finished levels and the intended fixing surfaces. For docks, add pit dimensions and vehicle approach.

Selection inputs

Record traffic direction, duty, exposure and visibility needs. Check proposed tracks, guides or curtain head assemblies against building services and the structure.

Written scope

Agree the proposed product, options, work boundaries, site readiness and approval information. Record the revision of the opening dimensions before ordering.

Remote and on-site review

Photographs and drawings support initial enquiries. Site visits are discussed in relation to location and the available technical information.

Prepare for the first discussion

  • Dimensioned plans and sections
  • Site address and building use
  • Traffic, opening duty and vehicle dimensions
  • Programme and required performance

Project stages

  1. Provide site information

    Submit dimensions, photographs and the operating brief.

  2. Review the equipment

    Compare door, dock and access options against the opening.

  3. Agree scope

    Clarify site preparation, responsibilities and drawings for approval.