Track and building coordination
Standard, high or vertical lift layouts depend on the headroom, side clearances and overhead equipment. Submit a building section as well as the clear opening dimensions.
Panel configuration
Opaque sections, windows, glazed sections and personnel access options suit different traffic and visibility requirements. Coordinate any separate pedestrian route with the site design.
Information for quotation
Include the wall structure, electrical supply, operating direction and anticipated cycles so the scope can be assessed against the opening.
Survey and track planning
Show crane rails, ducts and beams in the open-door section. Coordinate floor levels and drainage with the available vehicle clearance. Track space depends on the lift arrangement offered.