Plot the routes
Use the site plan to identify walking routes, waiting zones, vehicle lanes and any crossing. Draw both sides of the automatic entrance so the approach is visible.
Identify the required sequences
List routine operation, busy periods and the role of any access control. Confirm equipment and building interfaces with the site designer.
Document retained systems
For refurbishment, list controls, power supplies, supports and cabling that remain in use. Confirm which parts of the work need a temporary alternative route.