Build a schedule by bay
Give vehicle categories, bed level range, approach and handling equipment. Identify where smaller or larger vehicles may use a separate bay.
Connect the schedule to the section
Show pit dimensions, finished floor level, open door position, dock bumpers and shelter fixing. Verify vehicle and equipment clearance against model documentation.
Record supply and site conditions
Confirm handling access, alternative bays during works and the accepted operating scope for each product.
