Begin with a project brief
State the country, city, sector, target delivery window and date the site will be ready. Give each opening the same reference in the plan and door schedule.
List operational and building inputs
Record clear opening, headroom, side room, structure, expected duty and exposure for each opening. Reference the relevant drawings for power, controls and other trade interfaces.
Confirm the quotation scope
Separate packing, shipping, unloading, site installation and commissioning. State the required documentation language and technical approval process.