Start with the fire strategy
Provide the location, dimensions, wall construction and classification required by the project. State any destination-specific document format or language requirements.
Review evidence against the offered assembly
Compare the model, allowed sizes, fixing and operating arrangement with the documentation. Ask for clarification where the specified configuration differs from the evidence.
Coordinate the site interface
Agree roles for alarm integration, controls and commissioning. Track drawing references and approvals within the project document set.