Before works
Check the opening, fixing surfaces, access, unloading position, working area and supply. In a live facility, agree closure windows and temporary routes with the site team.
Building and controls interfaces
Identify who is responsible for electrical, civil and control works. Where building management or alarm interfaces are specified, agree the functions and commissioning responsibilities.
Commissioning scope
Relate checks, operating sequences and acceptance records to the proposed model and project requirements. Coordinate the parties that must be present.
Handover records
Match installed products to opening references. Assemble operating and maintenance documents, contact details and any remaining items in the handover record.