Make room for travel
Plot the parking space, supporting wall and threshold. Keep the intended travel path clear of equipment and services.
Match the fire strategy
Review classification, opening size and wall construction against documentation for the proposed assembly. Describe alarm and control interfaces in the project brief.
Provide plan and section
Show the open and closed positions, finished surfaces, existing obstructions and nearby building services.
Side travel and parked position
Mark wall lengths, parked leaf and services on both sides of the opening. Compare leaf travel, support and interference points with the project fire strategy and required evidence.