Share the project requirements
State the required classification, opening dimensions, support construction and mounting position. Check the offered assembly and dimensions against its accompanying evidence.
Coordinate the sequence
The project team should document the alarm interface, closing behaviour, responsibility boundaries and required commissioning checks.
Check available space
Plot guides, head assembly and service clearance on the building section and coordinate nearby services.
Connect evidence to the opening
Specify project-required performance, opening dimensions and supporting construction. Confirm that offered model and fixing arrangement match the project evidence. Coordinate alarm and closing functions with the building team.