Start with the room schedule
List the clear passage, cleanliness requirements, surface finish and any observation window. Coordinate architectural and mechanical criteria, including project-defined pressure or sealing requirements.
Wall and threshold detail
Show the finished wall, frame support and floor detail. Review net width and height against bed and equipment routes.
Interfaces and evidence
Specify activation, access control and any required evidence in the enquiry. Documents and performance requirements should be checked against the quoted configuration.
Room-by-room requirements
Provide clear bed and equipment passage, wall finish, surface requirements and any observation panel. Review required sealing and pressure criteria against the project brief and proposed assembly.