Record existing conditions
Supply opening measurements, photographs in open and closed positions, supports and control arrangements. Identify steelwork, concrete, cabling or controls that will remain.
Define the business need
More frequent maintenance, higher vehicles, increased traffic and a façade change create different replacement priorities. Describe what must be achieved and any openings that must remain operational.
Removal and temporary access
Agree removal, handling, waste responsibilities and closure windows. Identify temporary access and the new product’s fixing and electrical requirements.
Compare against acceptance criteria
Check clear passage, operating sequences and handover records against the original renewal brief. Keep updated drawings in the site record.