Skip to content
Sakarya, Türkiye
Etadoor

International Project Guides

Reviewing Fire Door Evidence in a Quotation

Check the required classification, supporting construction, clear opening and offered assembly against the project fire strategy.

Red side-sliding fire door inside an industrial facility

Start with the fire strategy

Provide the location, dimensions, wall construction and classification required by the project. State any destination-specific document format or language requirements.

Review evidence against the offered assembly

Compare the model, allowed sizes, fixing and operating arrangement with the documentation. Ask for clarification where the specified configuration differs from the evidence.

Coordinate the site interface

Agree roles for alarm integration, controls and commissioning. Track drawing references and approvals within the project document set.

Tell us about your opening and operation.

Review product options, dimensions and scope with the Etadoor team.

Request a Quote