Start with the room schedule
Define clear passage, wall construction and finish for each clinical or controlled area. Share the relevant architectural, mechanical and operational criteria.
Coordinate controls and visibility
List observation panels, access control, activation and any operating sequence between rooms. Issue the agreed operating brief with the request.
Check the proposed assembly
State the required sealing and finish criteria. Match documentation to the door model and planned installation arrangement.